Anti-Pull-Out Coupling · PE Pipe DE63–DE1200
Restrained Universal Coupling
Joins two plain-end PE pipes — or repairs a damaged PE main — and stops them pulling apart. A brass grip ring at each end bites into the pipe as pressure pushes outward, so the joint carries the full end load. No fusion machine, no power, and it works in a wet trench.
- Pipe: PE80 / PE100, DE63–DE315; large range DE355–DE1200
- Pressure: PN10 / PN16
- Design: EN 12842, ductile iron fittings for PE and PVC-U
- Grip rings: Brass, one each end
- Deflection: Up to 3°
- Body: Ductile iron EN-GJS-400-15, EPDM gaskets
- Finish: Blue fusion-bonded epoxy; stainless steel bolts
Restrained Coupling Dimensions
Sized by PE pipe OD (DE). All dimensions in mm. L is the overall length; D is the end ring OD.
Swipe the table →
| PE pipe OD (DE) | L | D | Bolts |
|---|---|---|---|
| 63 | 125 | 130 | M10×2 |
| 75 | 126 | 142 | M10×4 |
| 90 | 128 | 160 | M10×4 |
| 110 | 130 | 180 | M10×4 |
| 125 | 134 | 195 | M10×4 |
| 140 | 145 | 221 | M10×4 |
| 160 | 170 | 235 | M10×4 |
| 180 | 185 | 255 | M10×4 |
| 200 | 210 | 274 | M10×4 |
| 225 | 215 | 302 | M10×4 |
| 250 | 240 | 328 | M10×6 |
| 280 | 250 | 358 | M10×6 |
| 315 | 300 | 392 | M10×6 |
Large range, DE355–DE1200
Swipe the table →
| PE pipe OD (DE) | L | D | Tie bolts | Grip ring bolts |
|---|---|---|---|---|
| 355 | 170 | 510 | M16×300 ×6 | M16 ×6 |
| 400 | 180 | 556 | M16×320 ×8 | M16 ×8 |
| 500 | 180 | 658 | M16×320 ×8 | M16 ×8 |
| 630 | 200 | 790 | M16×360 ×10 | M16 ×10 |
| 710 | 200 | 870 | M16×360 ×12 | M16 ×12 |
| 800 | 220 | 965 | M16×400 ×12 | M16 ×12 |
| 900 | 220 | 1070 | M16×400 ×14 | M16 ×14 |
| 1000 | 220 | 1172 | M16×400 ×14 | M16 ×14 |
| 1200 | 240 | 1380 | M16×430 ×16 | M16 ×16 |
The large range has a wider tolerance and handles slightly oval pipe. Made to order; confirm the pressure class when you enquire.
How Much Load Do the Grip Rings Hold?
Pick your PE pipe and pressure. The calculator shows the force trying to pull the pipes apart, checks the pipe rating and gives our size.
End load and size check for PE pipe
The grip ring has to hold this load. A plain coupling or flange adaptor would let the pipe slide out. Test pressure is taken as 1.5 × working pressure.

Why PE pulls out
- Pressure thrust: pushes the pipe out at valves, bends, tees and dead ends.
- Temperature: PE shrinks about 0.18 mm per metre for every °C it cools.
- Poisson effect: under pressure, PE swells slightly and gets shorter.
- Grip ring: turns all three into a load the joint carries, instead of a pipe that slides out.
How It’s Built
Five parts. The gaskets seal; the grip rings hold.

- 1. Centre sleeve: — Ductile iron EN-GJS-400-15. Bridges the gap between the pipe ends.
- 2. EPDM gaskets: — EN 681-1, one at each end. Seal on the outside of the PE pipe.
- 3. Brass grip rings: — Toothed rings behind the gaskets. They bite harder as the pipes try to move apart.
- 4. End rings and tie bolts: — Ductile iron end rings, stainless steel bolts. Tightening sets the gaskets and the grip rings.
- 5. Stainless stiffeners: — One inside each PE pipe end, so the wall can’t creep away from the gasket and the teeth.
Restrained Coupling or Electrofusion?
Both join PE and hold the end load. The difference is what you need on site.
Swipe the table →
| Restrained coupling | Electrofusion coupling | Universal coupling | |
|---|---|---|---|
| Holds the end load | Yes — grip rings | Yes — fused | No |
| On site you need | Spanner, torque wrench | Control box, power, scraper, clamps | Spanner |
| Wet trench, live repair | Yes | No — ends must be dry and scraped | Yes |
| Time per joint | Minutes | Preparation, fusion and cooling time | Minutes |
| Different SDR, same OD | Yes — seals on the OD | Within the fitting’s SDR range | Yes |
| PE to another pipe material | No — PE both ends | No | Yes, if both ODs fit one range |
Choose a restrained coupling when
Site:
the trench is wet or there is no power
Repair:
the main must be back in service the same day
Crew:
no fusion crew is on site
Choose electrofusion when
Line:
it is new PE in a dry trench
Crew:
the fusion crew and kit are already there
Spec:
the specification asks for fused joints
Materials, Gasket and Coating
Standard materials are below. Tell us the PE grade and SDR, the medium and where it is installed.
Swipe the table →
| Part | Standard material | Standard | Options |
|---|---|---|---|
| Centre sleeve and end rings | Ductile iron EN-GJS-400-15 | EN 1563 | EN-GJS-500-7 |
| Grip rings | Brass | EN 1982 | — |
| Gaskets | EPDM | EN 681-1 | — |
| Bolts | Stainless steel | ASTM A276 | A2-70, A4-80 |
| Stiffeners | Stainless steel 304 | — | 316 for sea water |
| Coating | Fusion-bonded epoxy, blue, 250 µm min | DIN 30677-2 | Other colours |
PE pipe
For: PE80 and PE100, ISO 4427 / EN 12201, SDR 11 to 26, with a stiffener.
PVC-U: ask us — it needs a different grip ring.
EPDM gasket (standard)
For: water, drinking water, sewage.
Temperature: −10 to +70 °C
Not for: oil and fuel.
Bolts and finish
Stainless bolts: standard; A4 for sea water.
Blue epoxy: buried lines and chambers.
Petrolatum tape wrap: aggressive soil.
Order the stiffeners with the coupling: they are made to the pipe OD and SDR.
Installing a Restrained Coupling
Four steps. Stiffeners in, coupling centred, bolts even.

Fit the stiffeners
Cut both PE ends square. Push a stainless stiffener fully into each.

Mark the depth
Mark half the coupling length on each pipe end. Leave a small gap between the pipes.

Centre the coupling
Slide it over one pipe, line up the other, then centre it between the marks.

Tighten evenly
Opposite bolts, a turn at a time, until the end rings sit square. Torque to the label before the pressure test.
Options
Add these when the job needs them — each one is priced separately.

Stiffeners supplied
Stainless stiffeners made to your pipe OD and SDR, two per coupling.

A4 bolts
A4 (316) bolts for sea water and wet chambers. Stainless A2 is standard.

Large range
DE355 to DE1200 for PE trunk mains, with a wider tolerance for slightly oval pipe.

Slim type
Lighter ductile iron body with tie bolts, for service and distribution lines.
Why Buy From Our Factory
What decides whether a restrained coupling works is the grip on your pipe — the right OD, the right SDR, the right stiffener.

PE OD and SDR checked first
Send the PE grade, OD and SDR. We match the grip rings and stiffeners and send them back for approval before production.

Couplings, adaptors and joints in one order
Couplings, flange adaptors, dismantling joints and rubber joints come from one factory and ship in one container.

Pressure tested
Hydrostatic test at 1.5 × PN to EN 12266-1. Test report on request.

Factory price, quoted the same day
You buy from the production line, not through a trader. Send the size, pressure and quantity, and get a price the same working day.
Where It’s Installed

PE main repairs
Cut out the damaged length, add a new piece and close both ends with two couplings — no fusion.

Wet trenches, live repairs
No power, no dry ends, no cooling time. The main is back in service sooner.

Different SDR, same OD
SDR 11 to SDR 17: the coupling seals on the OD, so the wall thickness does not matter.
In Service
Restrained universal couplings from our factory, photographed by customers on site.
Restrained Coupling Price
What you pay depends on a few choices. Send them and we quote the same day.
What changes the price
- Size : PE OD (DE)
- Pressure : PN10 or PN16
- Type : standard, slim or large range
- Stiffeners : two per coupling, to your SDR
- Bolts : stainless A2 or A4
- Quantity : price breaks at 100 / 200 pcs
Reference price
| Size | Price per piece |
|---|---|
| DE90 | Get today’s price → |
| DE110 | Get today’s price → |
| DE160 | Get today’s price → |
| DE225 | Get today’s price → |
| DE315 | Get today’s price → |
| DE500 | Get today’s price → |
PN16, EPDM gaskets, brass grip rings, stainless bolts, blue epoxy, EXW Gongyi. Stiffeners priced separately.
Downloads
Datasheets, guides and references for submittals.
Restrained universal coupling
For all couplings and flange adaptors
Frequently Asked Questions
What is a restrained universal coupling?
A bolted coupling with a grip ring at each end. It joins two PE pipes and holds them together under pressure, so the joint carries the end load.
Restrained coupling or electrofusion — which is better?
Neither is better everywhere. Electrofusion suits new lines in dry trenches with a fusion crew. A restrained coupling suits repairs, wet trenches and sites without power.
Do I need stiffeners?
Yes, one in each PE pipe end, as Plastics Pipe Institute guidance (TN-45) recommends for mechanical joints on PE. We supply them to your OD and SDR.
Can it join PE to PVC or ductile iron?
Not this model — it is sized for PE at both ends. Send us both ODs and we suggest the right joint.
Can it join different SDRs?
Yes, if the OD is the same. The coupling seals on the OD; fit a stiffener sized for each SDR.
How much deflection can it take?
Up to 3°. Use it for slight misalignment, not to make a bend.
Is it suitable for drinking water?
Yes, with the standard EPDM gasket and epoxy coating. Tell us the approval your project needs (for example WRAS or NSF/ANSI 61) and we confirm the certificate before quoting.
What is the MOQ and lead time?
MOQ 1 pcs. Common sizes ship in 5-7 days; large diameters and special orders take 15-30 days.
Related Products

Restrained Flange Adaptor
- Type: Flange × PE pipe, grip ring
- Size Range: DE63–DE1200
- Use: PE to valves and pumps

Universal Pipe Coupling
- Type: Plain end × plain end, wide range
- Size Range: DN50–DN600
- Use: Repairs, joining different pipes

Universal Flange Adaptor
- Type: Flange × plain end, wide range
- Size Range: DN50–DN600
- Use: Pipe to valve, pump or meter

Double Flanged Dismantling Joint
- Type: VSSJAF (C2F), tie studs
- Size Range: DN65–DN3200
- Use: Removing valves and meters
Send Your PE Pipe Size, SDR and Pressure
We reply with the size, a drawing and a price within 24 hours on working days.

Contact Us
Tell us the PE grade, OD and SDR, the working pressure, whether it is a repair, and the quantity.